Difference between revisions of "S2-S/Normal Procedures"

From
Jump to: navigation, search
(STARTING)
(STARTING)
Line 29: Line 29:
 
#Volts – verify > 9 volts
 
#Volts – verify > 9 volts
 
#Water level – Verify 100%
 
#Water level – Verify 100%
#Vent valve - Open
+
#Vent valve - open
 
#Ignitor – on
 
#Ignitor – on
 
#Fuel Flow – 5%
 
#Fuel Flow – 5%
 
#Boiler fire – verify
 
#Boiler fire – verify
#Fuel Flow - Full
+
#Fuel Flow - full
 
#Boiler Temp. – monitor
 
#Boiler Temp. – monitor
  
Line 40: Line 40:
 
#Wait – 1 min.
 
#Wait – 1 min.
 
#Vent valve - close
 
#Vent valve - close
#Boiler Press. - Monitor
+
#Boiler Press. - monitor
  
 
'''At 200 psi Boiler Press.'''
 
'''At 200 psi Boiler Press.'''
 
#<li value='21'> Throttle – 5%
 
#<li value='21'> Throttle – 5%
#Amps – Verify not negative
+
#Amps – verify not negative
#Boiler Press. - Monitor
+
#Boiler Press. - monitor
  
 
'''At 300 psi Boiler Press.'''
 
'''At 300 psi Boiler Press.'''
 
#<li value='24'>Fuel Flow – apprx. 25%
 
#<li value='24'>Fuel Flow – apprx. 25%
#Throttle – Increase to 2000 RPM
+
#Throttle – increase to 2000 RPM
 
#Governor – on
 
#Governor – on
 +
#Throttle - increase to 2400 RPM
 +
#Governor - verify active
 
#RPM – verify between 2700 and 2900
 
#RPM – verify between 2700 and 2900
 
# Fuel Flow - adjust to center boiler press. diff.
 
# Fuel Flow - adjust to center boiler press. diff.

Revision as of 17:03, 11 April 2022

SECTION 4. NORMAL PROCEDURES

1 PREFLIGHT

A thorough pre-flight inspection is essential to the safe conduct of your flight. The following procedures are recommended:

Front

  1. Inspect bubble for cracks
  2. Inspect landing lights
  3. Inspect airspeed anemometer
  4. Inspect beacon and front nav lights
  5. Inspect right skids and struts

Right Side

  1. Inspect battery and electrical connections
  2. Inspect primary and auxiliary fuel pumps and fuel lines

2 STARTING

Use the following procedure for normal starts:

  1. Controls – neutral
  2. Collective – full down
  3. Throttle – idle
  4. Beacon – on
  5. Fuel Cutoff – on
  6. Rotor brake - off
  7. Switches (Bat., Gen., Fuel/Feed Pumps) – on
  8. Collective – raise slightly, then lower (verify low rpm horn sounds)
  9. Volts – verify > 9 volts
  10. Water level – Verify 100%
  11. Vent valve - open
  12. Ignitor – on
  13. Fuel Flow – 5%
  14. Boiler fire – verify
  15. Fuel Flow - full
  16. Boiler Temp. – monitor

At 212F Boiler Temp.

  1. Vent valve – verify steam present
  2. Wait – 1 min.
  3. Vent valve - close
  4. Boiler Press. - monitor

At 200 psi Boiler Press.

  1. Throttle – 5%
  2. Amps – verify not negative
  3. Boiler Press. - monitor

At 300 psi Boiler Press.

  1. Fuel Flow – apprx. 25%
  2. Throttle – increase to 2000 RPM
  3. Governor – on
  4. Throttle - increase to 2400 RPM
  5. Governor - verify active
  6. RPM – verify between 2700 and 2900
  7. Fuel Flow - adjust to center boiler press. diff.

3 TAKE OFF

4 CRUISE

5 PRE-LANDING

6 AFTER LANDING

7 SHUT DOWN

Use the following procedure to shut down the engine:

  1. Controls – neutral
  2. Collective – full down
  3. Governor – off
  4. Throttle – decrease to 2000 RPM
  5. Fuel Flow – cutoff
  6. Ignitor – off
  7. Rotor brake – on (when below 200 RPM)
  8. Switches (Bat., Gen., Fuel/Feed Pumps) – off