MD-500D/Cargo Hook
From
<
MD-500D
Revision as of 04:14, 21 November 2026 by
Kelly
(
talk
|
contribs
)
(Created page with " <span class=sa-section>SECTION 9. CARGO HOOK</span> === General === ==== Description ==== ==== Cargo Hook Installation ==== ==== External Load Equipment ==== === Cargo Hook...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to:
navigation
,
search
SECTION 9. CARGO HOOK
Contents
1
General
1.1
Description
1.2
Cargo Hook Installation
1.3
External Load Equipment
2
Cargo Hook System
2.1
Cargo Hook Assembly
2.2
Electrical Release System
2.3
Manual Release System
2.4
Cargo Hook Circuit Breaker
2.5
Cargo Hook Controls and Indicators
3
Operating Limitations
3.1
Maximum External Load
3.2
Gross Weight Limitations
3.3
Center of Gravity Limitations
3.4
Airspeed Limitations
3.5
Load Attachment Requirements
4
Preflight Inspection
4.1
Cargo Hook Inspection
4.2
Release Mechanism Check
4.3
Sling and Rigging Inspection
4.4
Electrical System Check
5
Normal Procedures
5.1
Preparation for External Load Operations
5.2
Cargo Hook Engagement
5.3
Load Attachment
5.4
Load Pickup
5.5
External Load Flight
5.6
Load Delivery
5.7
Load Release
5.8
Postflight Inspection
6
External Load Handling
6.1
Hovering with External Loads
6.2
Load Swing and Oscillation
6.3
Load Stabilization
6.4
Turns and Maneuvering
6.5
Approach and Landing with External Loads
7
Emergency Procedures
7.1
Emergency Load Release
7.2
Electrical Release Failure
7.3
Manual Release Failure
7.4
Uncommanded Load Release
7.5
Excessive Load Oscillation
7.6
Engine Failure with External Load
8
Cargo Hook Servicing
8.1
Inspection and Maintenance
8.2
Release Mechanism Testing
8.3
Component Replacement
1
General
1.1
Description
1.2
Cargo Hook Installation
1.3
External Load Equipment
2
Cargo Hook System
2.1
Cargo Hook Assembly
2.2
Electrical Release System
2.3
Manual Release System
2.4
Cargo Hook Circuit Breaker
2.5
Cargo Hook Controls and Indicators
3
Operating Limitations
3.1
Maximum External Load
3.2
Gross Weight Limitations
3.3
Center of Gravity Limitations
3.4
Airspeed Limitations
3.5
Load Attachment Requirements
4
Preflight Inspection
4.1
Cargo Hook Inspection
4.2
Release Mechanism Check
4.3
Sling and Rigging Inspection
4.4
Electrical System Check
5
Normal Procedures
5.1
Preparation for External Load Operations
5.2
Cargo Hook Engagement
5.3
Load Attachment
5.4
Load Pickup
5.5
External Load Flight
5.6
Load Delivery
5.7
Load Release
5.8
Postflight Inspection
6
External Load Handling
6.1
Hovering with External Loads
6.2
Load Swing and Oscillation
6.3
Load Stabilization
6.4
Turns and Maneuvering
6.5
Approach and Landing with External Loads
7
Emergency Procedures
7.1
Emergency Load Release
7.2
Electrical Release Failure
7.3
Manual Release Failure
7.4
Uncommanded Load Release
7.5
Excessive Load Oscillation
7.6
Engine Failure with External Load
8
Cargo Hook Servicing
8.1
Inspection and Maintenance
8.2
Release Mechanism Testing
8.3
Component Replacement
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
SA Home
Main page
Recent changes
Random page
Help
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information