S-92/Normal Procedures

From
< S-92
Revision as of 00:58, 3 August 2021 by Kelly (talk | contribs) (Created page with "=== Start-Up === ====APU Start==== #Battery ON #Select EICAS on an MFD #Verify battery voltage at 28V (V-B). #APU GEN ON #APU CTL ON #APU AIR SRC ON #Verify primary bus (V-P...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

1 Start-Up

1.1 APU Start

  1. Battery ON
  2. Select EICAS on an MFD
  3. Verify battery voltage at 28V (V-B).
  4. APU GEN ON
  5. APU CTL ON
  6. APU AIR SRC ON
  7. Verify primary bus (V-P) voltage at 28V
  8. Verify adequate fuel

1.2 System Checks

  1. Verify MSTR CAUTION, #1 ENG OUT and #2 ENG OUT warning lights ON
  2. Lift collective slightly, verify horn and LOW RPM warning
  3. Rotor break OFF
  4. Anti-Col. ON (Upr and Lwr)
  5. Position Lights ON for night flight

1.3 Engine #1 Start

  1. #1 Ignition (IGN) ON
  2. #1 Fuel to DIRECT
  3. #1 Engine Control to IDLE
  4. Press and hold #1 Start
  5. Verify Engine #1 N1 at least 20%
  6. Verify Engine #1 N1 increase to 100%.
  7. AC Generator #1 ON
  8. DC Converter #1 ON