S-92/Normal Procedures
1 Start-Up
1.1 APU Start
- Battery ON
- Select EICAS on an MFD
- Verify battery voltage at 28V (V-B).
- APU GEN ON
- APU CTL ON
- APU AIR SRC ON
- Verify primary bus (V-P) voltage at 28V
- Verify adequate fuel
1.2 System Checks
- Verify MSTR CAUTION, #1 ENG OUT and #2 ENG OUT warning lights ON
- Lift collective slightly, verify horn and LOW RPM warning
- Rotor break OFF
- Anti-Col. ON (Upr and Lwr)
- Position Lights ON for night flight
1.3 Engine #1 Start
- #1 Ignition (IGN) ON
- #1 Fuel to DIRECT
- #1 Engine Control to IDLE
- Press and hold #1 Start
- Verify Engine #1 N1 at least 20%
- Verify Engine #1 N1 increase to 100%.
- AC Generator #1 ON
- DC Converter #1 ON
1.4 Engine #2 Start
- #2 Ignition (IGN) ON
- #2 Fuel to DIRECT
- #2 Engine Control to IDLE
- Verify Engine #2 N1 at least 20%
- Press and hold #2 Start
- Verify Engine #2 N1 increase to 100%
- AC Generator #2 ON
- DC Converter #2 ON